BamSHO
SHO Member
It already has. Cars being built now at the Chicago plant are stickered as 2016.
Disclaimer: Links on this page pointing to Amazon, eBay and other sites may include affiliate code. If you click them and make a purchase, we may earn a small commission.
If you look for the window sticker look for the G 1FAHP2XXXXXXXXXXX in the 10th digit Taurus should all be 1FAH P2 After that they split off
P2K is SHO P2E SEL I believe P2D SE Front wheel drive E SEL Front Wheel Drive P2K is SHO I know that much.
1FAHP2KXXXXXXXXXX
X 8th digit Engine
X 9th digit Check digit.....computer generated random
X- 10th Model Year
X 11th digit Plant Code G= Chicago Note 16 Taurus there could be two spots for G. G for Chicago and G for 2016
XXXXXX 12-17 digit........Plant Sequential assembly order
Starting in 2010 they started the alphabetical numbering system for US vehicles. I believe I O and Q are not used to avoid confusion with numbers one and Zero
A=2010 B=2011 C=2012 D=2013 E=2014 F=2015 G=2016
Where did you find the build date on the window sticker? I got the build sheets and all I can decipher there is that it was printed out at 2 AM on 7/9. I was told the build date was 7/6. I'm having a buddy print out an Oasis report so it will definitely be on there.I checked the build date on the window sticker...
Curious, mine doesn't have any numbers at the top. The dealer told me the build date was 7/6. When I got it, the build sheets had a printout date of 7/9 at 2 AM. I had a buddy print out the Oasis report and it has a build date of 7/9.At thevery top of your window sticker, there is a blend date. XYYYYMMDD then a larger 4 digit code for line sequencing. As I noted below, my blend date was 7/13, but my car didn't hit end of line until the 17th.
Update: Ordered 6/5. Blend date 7/13, but produced 7/17. Dealer said Monday that they haven't received shipment details from CAP yet...and I haven't been updated since. Really hope it isn't being held for an onsite mod or other issue.
Curious, mine doesn't have any numbers at the top. The dealer told me the build date was 7/6. When I got it, the build sheets had a printout date of 7/9 at 2 AM. I had a buddy print out the Oasis report and it has a build date of 7/9.
Thanks J5V! The blend date must have been on the backing of the window sticker.That sounds right. At the end of the link below, add your VIN. It will pull up your window sticker with the date info I mentioned. Blend date at the top along with sequence number.
http://fordlabels.webview.biz/webviewhybrid/WindowSticker.aspx?vin=