Hah! You ask the same question as does my wife!
Am currently about 90% finished with both the rough wall plumbing and electrical systems. All the ductwork for the HVAC is in. Hopefully, I will be calling for my rough inspections in a week or so, then I can begin insulating and hanging drywall. Probably will be moving late spring. I am doing most of the work by myself right now with occasional help from family members. Goes slowly that way..
If you want to have a sheetrock-hanging party some Saturday next month, let me know and I'll send out the invitations and order the food and drinks...
I did put 10' walls in that extra garage. A lift can still be added.....
Pics from October are at
http://f1.pg.photos.yahoo.com/ph/[email protected]/album?.tok=phZx84BBenMs8For&.dir=/81b8&.src=ph Roof is on and all doors are installed, but the siding will have to wait until warmer weather (another party!).
See ya.
Steve