DfwSho
New Member
Thanks to those that lended a hand (Murphy, Don, Martin)...et al.
After seeing the extensive labor required, the deal I was quoted from my own place of business doesn't seem too bad. I didn't think a $47/hr labor rate and parts at cost +10% could in no way equal over $1100 bucks, but every possible part is toast and it looks like a PITA job. As well, it's still got R-12....
Ah well....thanks for the vent-session...
After seeing the extensive labor required, the deal I was quoted from my own place of business doesn't seem too bad. I didn't think a $47/hr labor rate and parts at cost +10% could in no way equal over $1100 bucks, but every possible part is toast and it looks like a PITA job. As well, it's still got R-12....
Ah well....thanks for the vent-session...